South Fork Wind Turbine Blades Return to State Pier Pending ‘Lifting Equipment’ Repair

Three turbine blades returned to the New London State Pier where Ørsted and Eversource say workers are addressing an issue with lifting equipment that kept them from being unloaded at the South Fork Wind construction site. Three more blades and tower sections sit on the pier waiting to be loaded and taken away. (CT Examiner)

Share

TwitterFacebookCopy LinkPrintEmail

NEW LONDON — A barge carrying wind turbine blades returned to State Pier on Sunday with the blades uninstalled pending the repair of lifting equipment off Montauk. Eversource and Ørsted told CT Exami...

Haven’t subscribed yet? Click here to register.

CT Examiner is just $20 a year. And if you want to unsubscribe? That’s online and at the click of a button. No phone calls. No runaround. No hassle.

At less than a tenth the cost of our statewide competitors, our promise to you is no-nonsense federal, state, and local news that’s nonpartisan, respects your privacy and is ad-free.

Subscribe and see why CT Examiner is the fastest growing news source in Connecticut.