New London Makes Sense of Connecticut’s Selection of a Bridgeport-based Wind Deal

As New London leaders absorbed news on Thursday of Ørsted and Eversource’s failed bid to secure a large slice of Gov. Lamont’s envisioned 2,000 megawatts of offshore wind power, the future and implications for proposed investments in the State Pier were still unclear. But by Friday morning, David Kooris, acting chair of the Connecticut Port Authority, said that the Department of Energy and Environmental Protection’s choice of Vineyard Wind — rather than Ørsted/Eversource — for 804 megawatts of offshore wind power, would not cancel out the intended investment of $57.5 million into the infrastructure of State Pier. “Despite some of

More

Matthews, Former Connecticut Port Authority Head Defends Record, Will Testify

//

MYSTIC — Evan Matthews, former executive director of the Connecticut Port Authority, sat down with CT Examiner’s Cate Hewitt and Gregory Stroud on Sunday for a nearly four hour conversation ranging from details concerning the port authority during his tenure, his health, the wind deal at State Pier, to his hopes of clearing his name so that he can continue his maritime career.  The interview was the first time Matthews has spoken publicly since the port authority placed him on administrative leave on July 12 and subsequently forced him to resign on September 30. Matthews did not attend the Transportation

More

State Pier Operator Boosts Connecticut Port Authority Plans for New London

//

NEW HAVEN — “Fifteen years ago, the largest steel coil that was being brought off a ship was probably 15 tons. Today, you’re bringing in 30- to 35-ton coils of steel. The same thing with the heavy lifts, the cranes on the ships have gotten larger and larger, so port facilities have had to change to be able to handle those,” explained Gateway Terminal President James Dillman, an industry veteran and new hire by the New-Haven-based terminal operator. “It’s the same way with the container industry. Today the ships that are calling at container ports are almost three times as

More

45-Day Window for Connecticut Port Authority Hearings

//

It’s remarkable that former board chairs Scott Bates and Bonnie Reemsnyder have so far not answered a single substantive question from either the press or state legislators about their leadership roles in either the pending wind energy deal with Eversource and Ørsted, or in the near dissolution of the Connecticut Port Authority. The same can be said for Executive Director Evan Matthews, who for all we know may still be be drawing a salary from the state of Connecticut. In that regard, I’d like to join State Sen. Cathy Osten (D-Sprague) and State Rep. Christine Conley (D-Groton) in calling for

More

David Kooris Makes the Case for a “Niche Market” Wind Energy Deal for New London

///

David Kooris walked into Muddy Waters Café on Bank Street in New London like a regular – a measure perhaps of the time he has spent as Deputy Commissioner of the Department of Economic and Community Development (DECD) acting as an ambassador, a fixer of sorts, for the Lamont administration on a joint wind energy deal based out of New London which for the last months has threatened to unravel.  The deal pairs a wind developer Ørsted, an energy supplier Eversource, a port operator Gateway New London LLC, and the quasi-public Connecticut Port Authority, in a near-term investment of about

More

Public Turns Out in Support of Bay State Wind’s Energy Plans for New London’s State Pier

/

NEW LONDON — At the Connecticut Port Authority’s informational meeting Tuesday night, community sentiment tilted heavily in favor of accepting a deal to build a joint Ørsted-Eversource wind power facility at State Pier in New London before that opportunity dissolves or finds a home elsewhere.  David Kooris, acting chair of the port authority, gave an upbeat presentation to standing-room-only audience of about 200 people on the proposed upgrade of the pier’s infrastructure and managed to pivot attention away from questions concerning the port authority’s personnel and finances — as well as documentation requests — that have yet to be clarified. 

More

Letter: Wind Energy News is Lipstick on a Pig

/

To the Editor: RE “Ørsted and Eversource Pitch “Non-zero-sum Game” for Agreement with Port Authority” (Sept. 12, 2019): This is quite simply just a politically driven charade the cost of which, assuming it ever gets permitted, will all fall on the backs of the ratepayers. Just ask the Danes who now pay the highest electric rates in Europe even with their wind farms being able to depend on cheap hydro from Norway and Sweden for backup power, or the Germans who have had to import more coal to keep their baseload plants going which has actually INCREASED carbon emissions. Where

More

Ørsted and Eversource Pitch “Non-zero-sum Game” for Agreement with Port Authority

/

It’s no wonder that Connecticut has a case of the flutters — with so much unknown to the public, and the Connecticut Port Authority and port operator Gateway New London LLC on the verge of signing a long-term lease and partnership agreement with Eversource and Ørsted that could reshape the economic future of New London, as well as energy production and prices for Connecticut. As Matthew Morrissey, Vice President and Head of New England Markets for Ørsted explained it, more than once, “it’s really not a zero-sum game.” At least as we understood his thinking, that was a way of

More